WORK DONE IN 2016

After our contractor had finished the wall and I had leveled the house, I installed the two windows.

After our contractor had finished the wall and I had leveled the house, I installed the two windows.

 

The green wood is 17 feet of laminated 2 X 12 – two of them back to back. The braces are still on the wall that we used to raise the Lam Beams

The green wood is 17 feet of laminated 2 X 12 – two of them back to back.
The braces are still on the wall that we used to raise the Lam Beams

house-12-2016

Here is the ‘work-in-progress’ stage of our deck on the East side of the house. I have also removed some siding preparing for new door installation

Here is the ‘work-in-progress’ stage of our deck on the East side of the house.
I have also removed some siding preparing for new door installation

The deck runs the entire length of the house and will go all the way across the front (next year!). I have also begun scraping paint getting ready for later on when we paint.

The deck runs the entire length of the house and will go all the way across the front (next year!).
I have also begun scraping paint getting ready for later on when we paint.